Construction of V1 and V2 Viaducts and the engineering structures at the Artvin-Borçka State Highway – Artvin
Client
: YÜKSEL İNŞAAT A.Ş.
Contract Date
: 2003
Final Completion
: 2007
Contract Value
: 18.170.913,41 TL
As part of the Project, the V1 and V2 Viaducts and the retaining walls were constructed. The height of the centre pier is 70 meters and the total length of the two viaducts is 1000 meters .Moreover the abutment excavations were implemented by our company.

PRODUCTION

Within the scope of the project ;
-  120.000 m3 of concrete at the Viaducts
- 40.000 m3 of concrete at the retaining walls
- 23.000 tons of iron
- 120.000 m3 excavation