As part of the Project, the construction of the 2 subways, 40 bridges, 1 cut-and-cover and various engineering structures( retaining walls, headwalls etc) was completed. All the foundation excavation of these structures, at the specified area where the environmental and terrain conditions are very compeller, was implemented by our company .
PRODUCTION
Within the scope of the project ;
- 125.000 m3 of concrete
- 18.000 tons of iron
Were manufactured.