Construction of the Viaducts and the Implementation of the Final Pouring of Concrete For the Tunnel at the Ankara - Istanbul High-Speed Train Railway Project (Between Köseköy-Vezirhan) - Bilecik
Client
: CENGİZ – IC İÇTAŞ – BELEN JOINT VENTURE
Contract Date
: 2009
Final Completion
: 2010
Contract Value
: 2.800.000 TL
As part of this Project, the excavation of the footings, the reinforcement work and the final pouring of concrete of 2 tunnels and V14, V16 and V18 viaducts was conducted. The total length of the viaducts is 1950 m and the height of the centre pier is 10 m. Moreover, the tunnels are 1000 meters long in total and they have a diameter of 12.5 meters.
PRODUCTION
Within the scope of the project ;
- 65.000 m3 of concrete
- 10.000 tons of iron
were manufactured