Marmaray Project, BC-1 Agreement, Sirkeci South and North Entrances (Stations) Main Construction Works - İstanbul
At Marmaray Project, as one of the most important infrastructure transportation projects around the world and the ’ Project of the Century’ as called in Turkey,the productions of the concrete, iron,form works and the installation of the cooling pipes ,which are work items of BC-1 Railway Bosphorus Passing, Tunnels and Stations Work Category and under the definitons of Sirkeci North and South Stations Permanent Construction Works. These sations are the first stations in the European Side of Istanbul, after the tube tunnel and are both are underground stations.
PRODUCTION
As part of the project;
- 14.000 m3 of concrete
- 30.000 m2 of form
- 3.000 tons of iron
- 25.000 m3 supoorting scaffolding
- 30.000 m. cooling pipe installation