Construction of Kayseri Develi Gümüşören Dam-Kayseri
Client
: 12. Regional Directorate of State Hydraulic Works - Kayseri
Contract Date
: 2011
Final Completion
: 2013
Contract Value
: 49.742.865 TL
The Gümüşören Dam is being built in order to supply energy and irrigation to the region between Kayser-Develi  ( as the 2nd phase of the Project) 

Technical Characteristics of the Dam;
 
Dam volume :  2.050.000 m3 (clay core, sand-gravel fill)
RCC Volume : 180.000 m3 rcc (Roller Compacted Concrete)
Height from base :  36.50 m
Height from thalweg :  30.00 m 
Crest length :  842,00 m
Crest width :  10.00 m
Storage Volume:  195.000.000 m3
Inner diameter of diversion :  3,50 m
Length of diversion : 47,00 m
HEPP Installed capacity: 5 MW
Annual amount of energy production : 11,90 GWh