Within the scope of the Project the following Works are being conducted;
- Form, concrete and iron works of the Central Building (height: 46 m), tailwater canal, stilling basin, power conduit and discharge canal.
-Construction of 5 TCDD displaced bridges (total length: 900 m, height :32 m) - Final concrete pouring of T1 Tunnel
- Fabrication and installation of the prefabricated beams of the spillway and intake structure.
PRODUCTION
120.000,00 m2 of form
150.000,00 m3 of concrete
9.000,00 tons of iron
80.000,00 m3 excavation
5.000,00 m bored pile production (Ǿ 120 )
162 pre tensioned bridge girder production and installation
240 nonprestressed bridge girder production and installation