Construction of the Civil Viaduct at the Ordu Freeway Project – Ordu
Client
: NUROL İnş.ve Tic.A.Ş.+YÜKSEL İnş.A.Ş.+ÖZKA İnş.A.Ş.+DORUK Pro.İnş.Taah.Mad.Jeo.Tur.San. ve Tic.Ltd.Şti. Joint Venture
Contract Date
: 2012
Final Completion
: 2013
Contract Value
: 4.267.134 TL
As the aim of the Project, the Civil Viaduct, 1350 meters long and 17 meters high, is going to be constructed.
PRODUCTION
Within the scope of the project ;
- 35.000 m3 of concrete
- 50.000 m3 excavation
- 8.000 tons of iron