Construction of the Battalgazi Crossroad Bridge at the Malatya – Elazığ Road - Malatya
Client
: GENERAL DIRECTORATE OF HIGHWAYS
Contract Date
: 2011
Final Completion
: 2012
Contract Value
: 11.500.871 TL
The crossroad bridge was constructed at the center of the city called Malatya, and is 700 meters long with two lanes of round trip. 

PRODUCTION

Within the scope of the project;
- 13.500,00 m. bored pile production (with 100 and 120 cm diameter)
 - 25.000,00 m3 of concrete 
- 3.000,00 tons of iron
-  130.000,00 m3 excavation
- 7000 m2 production and installation of precast facing member
- 7000 m. production and installation of prefabricated concrete crub
- 74 pre tensioned bridge beams  
- 4.000,00 m. drainage implementation