The Final Pouring of Concrete of the Derivation Tunnels and the Construction of the Downstream Service Bridge at Ilısu DAM and HEPP Project - Mardin
As the part of this Project, the reinforcement work and the final pouring of concrete of the derivation tunnels , which are 2000 meters in length and have inner diamater of 12 meters, and the construction of the downstream, which is 250 meters long, was conducted. Moreover the abutment excavations were implemented by our company.
PRODUCTION
Within the scope of the project ;
- 80.000 m3 of concrete
- 11.500 tons of iron
were manufactured.